Case Study

Securing High-Availability Telemetry across 14 Sites

Global Pharmaceutical Manufacturer

Securing High-Availability Telemetry across 14 Sites
52 → 94
BCS Score
-90%
Uptime Outages
<12m
Critical MTTR

01 // The Challenge

Operating 14 GMP-compliant pharmaceutical manufacturing facilities requires strict network availability. Ambient sensors, automated batch packaging lines, and cold-storage tracking servers must remain online continuously to prevent costly product loss.

The client's internal IT team was suffering from extreme alert fatigue, receiving over 400 un-deduplicated alarms daily from secondary switches and sensors. This led to alert blindness, causing them to miss a critical HVAC link degradation that ruined a $140,000 temperature-sensitive batch.

Additionally, unauthorized configuration changes by local engineers went un-audited, introducing configuration drift across firewalls and backup servers.

02 // The Solution

VEMIO was deployed across all 14 manufacturing units to give the client one operational view of critical network health, site impact, and incident ownership.

Vinay Enterprises' 24/7 physical Network Operations Center (NOC) took over day-to-day triage, ensuring critical incidents triggered automated tickets and engineer assignments within a 15-minute response SLA.

Configuration backup and change visibility were added to the monthly governance rhythm, giving the client stronger recovery confidence and better audit evidence.

03 // The Impact

The client's Business Continuity Score (BCS) increased from a failing 52 to a healthy, audited 94. The scorecard is now reviewed directly during monthly executive board sessions.

Uptime outages were reduced by 90% through proactive telemetry tracking (detecting link errors before outright device failure).

Mean Time to Resolution (MTTR) for critical network incidents dropped to under 12 minutes, eliminating product loss due to server and network sensor outages.